Collaboration CEN Solutions and EAG for ITER
Collaboration CEN Solutions and EAG for ITER
Collaboration CEN Solutions and EAG for ITER
ℹ️ The successful collaboration between CEN Solutions and EAG (Empresarios Agrupados – GHESA) 🤝 has delivered 6 Safety Important Class (SIC) cubicles of the Tokamak Cooling Water System (TCWS) to our customer ITER Organization, following their design, qualification, fabrication and testing. 👌
➡️ The tokamak cooling water system, intended to manage the heat generated during the operation of the tokamak, is the primary source of cooling for ITER and has the capacity to remove 1 GW of heat.
🔎 It is designed to cool client systems, such as the first-wall/blanket, vacuum vessel, divertor, and neutral beam injector.
🔎 SIC SCC interface the sensors and actuators in the plant, that are looped for monitoring and control, and the safety control system.